Process Flow
|
FLOWCHART INCOMING/ASSY/REWORK |
PROCESS STEP |
DESCRIPTION |
INSPECTION/ TEST CRITERIA |
|---|---|---|---|
![]() |
Incoming Raw Material Inspection |
Wafers, Die |
Visual
Dimensional Thickness C of C Verification |
| Packages and Lids |
Dimensional
C of C Verification |
||
| Packaging Materials |
Shelf Life
C of C Verification |
||
![]() |
Wafer Probe (If Required) |
100% Die Level Electrical, Test Rejects Are Red Inked | |
|
Wafer Probe Monitor |
Monitor Probing | Probe Defects | |
![]() |
Kit for Assembly | Wafer(s) or Die are Kitted with Packages and Lids, Minco Bonding Diagram and Manufacturing Router | |
![]() |
Wafer Mount (If Required) |
Preparation for Die Separation | |
|
Wafer Mount Monitor |
Visual Inspection | ||
![]() |
Wafer Saw (If Required) |
Die Separation | Alignment Accuracy |
| Wafer Wash | Wash Wafer Utilizing High Pressure DI Water | N/A | |
|
Wafer Saw Monitor |
Saw KERF |
Saw Quality Saw Accuracy |
|
![]() |
Die Visual | Visually Inspect Die | Visual Inspection |
![]() |
Die Visual Process Monitor |
Visually Inspect Die | Visual Inspection |
![]() |
Die Attach | Die Bonded to Package | Defects |
![]() |
Epoxy/ JM7000 Cure |
Check Oven Temperature |
Epoxy Cure Temperature |
![]() |
Die Attach Monitor |
Visual Quality
Die Shear Test |
|
![]() |
Wire Bond | Gold Ball Bonds 0.7 to 1.25 Mil Wire Aluminum Wedge Bonds 1.0 to 25 Mil Wire | Defects |
![]() |
Wire Bond Monitor |
Visual Quality
Wire Bond Pull Test |
|
![]() |
Pre-Cap Inspection |
Visual Inspection in Accordance with Mil-Std-883, Method 2010, Class B | Visual Inspection |
![]() |
Hermetic Seal | Solder Reflow, Glass Frit, Compression Weld | |
![]() |
Post Seal Visual Inspection |
Visually Inspect the Package Seal | Visual Inspection |
![]() |
Marking | Mark parts Accordance with Applicable Specification | Visual Inspection |
![]() |
Stabilization Bake (If Required) |
Bake devices in Accordance with Applicable Specification | N/A |
![]() |
Temperature Cycle | Temperature Cycle in Accordance with Mil-Std-883, Method 1010 | N/A |
![]() |
Constant Acceleration | Centrifuge in Accordance with Mil-Std-883, Method 2001 | N/A |
![]() |
External Visual Inspection |
Visually Inspect in Accordance with Mil-Std-883, Method 1010 | Visual Inspection |
![]() |
Fine Leak Test | Fine Leak in Accordance with Mil-Std-883, Method 1014 |
Helium Mass Spectrometer |
![]() |
Gross Leak Test | Gross Leak in Accordance with Mil-Std-883, Method 1014 |
Fluorocarbon Bubble Test |
![]() |
Pre Burn-In Electrical Parameters |
Test devices in Accordance with Applicable Specification | Electrical Test |
![]() |
Burn-In | Burn-In Devices in Accordance with Mil-Std-883, Method 1015 and Applicable Specification | |
![]() |
Interim (Post Burn-In) Electrical Parameters | Test devices in Accordance with Applicable Specification | Electrical Test |
![]() |
Percent Defective Allowable (PDA) |
Calculation of Lose From Pre Burn-In Parameters to Interim Burn-In Parameters | |
![]() |
Final Electrical Test | Test devices in Accordance with Applicable Specification | Electrical Test |
![]() |
External Visual | Visually Inspect in Accordance with Mil-Std-883, Method 2009 | Visual Inspection |
![]() |
Quality Conformance Inspection Sample Selection |
Sample Selection |